CLOSE

Showing Posts In 2018

Industry news and projects


Filter Year:
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • Nov 15

    4 Wellington Place| Leeds

    Further success for CSD on the Wellington Place Development, Leeds

    CSD are delighted to announce our appointment to provide the detailed MEP Design on behalf of Castle Building Services Ltd on 4 Wellington Place, Leeds.

    CSD will dra...

    Sep 27

    Mustard Wharf | Leeds

    CSD have been appointed by SES Engineering Services Ltd to provide a detailed RIBA Stage 4a design for the mechanical, electrical services and public health servcies.

    The residential scheme in Leeds is located next to some of the city̵...

    May 4

    Opera North | Leeds

    CSD have been appointed as Building Services Engineer to the refurbishment and regeneration of parts of the existing Grade II Listed Leeds Grand Theatre & Howard Assembly Rooms.

    May 3

    York Community Stadium

    CSD has been re-appointed to carry out the detailed MEP Design for the multi-million pound York Community Stadium and Leisure Complex scheme on behalf of Wates owned SES Engineering Services Ltd.
    SES have been re-engaged by Buckingham Contr...

    Apr 26

    Headingley Stadium Redevelopment Leeds

    Further success for CSD on Headingley Stadium Redevelopment: CSD have been appointed to provide a detailed Stage 4a design on behalf of G & H Building Services for the prestigious new Headingley Stadium Redevelopment, providing a wealth of e...

    Latest News

    Industry news and projects
    See All
    Sep 27

    Sayner Lane & Canal Mills, Leeds

    Double success for CSD within the Residential Sector

    CSD have been appointed on behalf of Country Large for 2 No prestigious residential developments in the heart of Leeds.

    CSD have been appointed t...

    Sep 27

    Green Park & Woodhall Community Sports Hubs

    CSD have been appointed on behalf of BAM Construction to deliver a detailed Stage 4 Mechanical & Electrical design for Green Park & Woodhall Sports Hubs

    2 No New sports hubs will b...

    Sep 27

    DfE CF21 Framework

    CSD build on MMC success with a place on the CF21 Framework within the Education Sector

    CSD has secured a place with Wates Construction Ltd as their preferred Building Services & Environmental Partner for the delivery ...

    Sep 27

    Electric Vehicle Charging Solutions

    Success for CSD within the Electric Vehicle Charging Sector

    CSD have been selected by Ground Control as their preferred design partner on the installation of electric vehicle charging points to over 1500 sites nati...

    Jun 12

    Harrogate Convention Centre

    CSD have been appointed on behalf of BAM Construction to deliver a detailed Stage 4 Mechanical & Electrical design for the refurbishment of Harrogate Convention Centre.

    The refurbishment of the 42-year...

    Site designed and built by Bluestone98.com