CSD have been appointed on behalf of BAM Construction to deliver a detailed Stage 4 Mechanical & Electrical design for the refurbishment of Harrogate Convention Centre.

The refurbishment of the 42-year-old Convention Centre will include improving conferencing facilities, known as the “Studio 2 works”, as well as providing a main works package including essential accessibility improvements and mechanical and engineering upgrades.

A large venue, several interconnected buildings include a 2,000-seat conference auditorium, plus more than 13,000 sqm of exhibition space.

Its facilities also include the Royal Hall, a multi-purpose entertainment space with a capacity of 978 theatre-style.