Latest News
Sep 27, 2023DfE CF21 Framework
CSD build on MMC success with a place on the CF21 Framework within the Education Sector
CSD has secured a place with Wates Construction Ltd as their preferred Building Services & Environmental Partner for the delivery of the DfE’s (Department for Education) CF21 Framework across the UK and are currently working on Woldgate School & Sixth Form College in Pocklington, East Yorkshire.
The plans for Woldgate School and Sixth Form College in Pocklington include a new main teaching building, new sports facilities and landscaped grounds.
The DfE schools’ construction framework and is expected to be worth £7bn to the chosen contractors over its four-year term.
The framework is split into three value bands, and each value band is subdivided into regions:
- high value band (£12m+) – two regions
- medium value band (£6m to £12m) – eight regions
- low value band (£0.5m to £6m) – 12 regions
CSD have been working collaboratively with Wates over the last 18 months to develop a tailored MEP design for schools including the integration of Wates owned PRISM offsite M&E Service modules into the design along with LZC technologies.
CSD Managing Director Mark J Nelson commented “CSD have successfully delivered over 42 Schools on behalf Wates Construction over the last 10 years, to be selected as their preferred partner is a fantastic achievement and as such, we look forward to working with Wates & the DfE in delivering these Net Zero Carbon in Operation schools for the future”