Driffield Leisure Centre
Build Value: £12m
M&E: £1.9m
Scope:
The MEP Design consisted of a LPHW Heating System via CHP, boilers, pumps and a mixture of underfloor heating and warm air. Separate air handling units were installed for the Swimming Pool, Reception and Dry Changing area, Tone Zone and Multi-function Room. Domestic Services were via a storage tank, booster set and packaged plate heat exchanger with buffer vessel. Comfort cooling is provided to the tone zone, multifunction room and Managers Office.
Along with Electrical Site Infrastructure works, Cable Management, Lighting, Emergency Lighting, Fire Alarms, Small Power, Public Address, Television Systems, CCTV, Security, External Lighting, and full BMS.
Start your project today!
Commercially driven design solutions to meet all our Clients aspirations.
We will provide expertise & capacity to undertake design works from concept, through development, via delivery on site to completion and handover.
We have capacity and experience to deliver
major projects.
Project portfolio of MEP schemes ranging in install values from £500k up to £30m.
High ratio of repeat business.
Alliances with major national contractors, end users and developers.
ISO9001 Accredited Insurance certificateGet in touch with one of our experts